MILTON萬昇建築工程

12 images

Construction illustrations

These illustrative images from Ryer’s service and management chapters explain trades, equipment and working arrangements.

Illustration of workers checking façade joints from an access platform
Façade maintenance illustration showing platform access to window surrounds and panel joints.
Illustration of workers fitting an interior partition frame
A fit-out illustration shows metal partition framing beneath the ceiling services.
Alterations illustration showing a steel beam and props
Beams, temporary supports and a wall opening illustrate an alterations setting.
Illustration of a concrete frame and working floor
A concrete superstructure illustration shows the slabs, columns and open work floor.
Illustration of engineers reviewing drawings
A drawing review illustrates a team checking design information before work.
Illustration of steel, timber and packaged materials on site
An illustration of site material storage and supply.
Illustration of an engineer with plans and a survey instrument
A survey instrument and working drawings illustrate on-site technical coordination.
Site safety briefing illustration
Two workers discuss site conditions in front of the building frame.
Quality control illustration with a measuring caliper
A caliper checks a component dimension in this quality-control illustration.
Illustration of labelled construction-site recycling bins
Colour-coded bins illustrate the separation of construction waste.
Illustration of a programme being reviewed on a tablet
The illustration shows a work programme being reviewed on a tablet.
Concept illustration of a fit-out floor with workers and access towers
The draft profile labels this interior work-floor concept as an illustration.
Back to the project gallery

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team