
Building construction and foundations
From urban piling packages to the structure, finishes and services of a complete building.
From the foundations of a new building to a window due for inspection, explore Milton’s construction, inspection, repair and consultancy services in Hong Kong.

Define the work from the ground up, from foundations and slopes to changes within an occupied floor.

From urban piling packages to the structure, finishes and services of a complete building.

Extend or reconfigure occupied premises and coordinate existing structure, services and access.

Translate display, working patterns and domestic routines into layouts, finishes, lighting and services.

Identify the slope, drainage and adjoining land so the project consultants can define the repair area.
Start with the notice, drawings or site condition to identify the relevant inspection or submission.

Identify the common parts, façades, projections and balconies covered by a building inspection notice.

Coordinate inspection by a Qualified Person, any required repairs and the associated window records.

Coordinate site photographs, location plans and the commencement or completion documents for the relevant works.

Review notices, existing works and plans, then coordinate surveys, remedial proposals or removal.
Trace a stain, renew a roof or plan the replacement of plant that a building relies on.

Turn defects in façades, lobbies and shared spaces into repair packages that can be phased around occupants.

Interpret thermal patterns alongside visible staining and the times when water appears.

Address podiums and local plant-room roof waterproofing, or renew drains serving a site or building.

Coordinate air conditioning, fire services, plumbing and electrical work around existing systems and occupants.
Agree the budget and professional appointments, or establish what a premises licence requires of the building.
Try a building element or a symptom, such as “façade” or “staining”.
Browse construction and alterations, inspections and submissions, repair and building services, or management and consultancy. Each service page identifies the scope and the relevant pages of the company profile.
Have the site location, photographs, proposed scope and intended timeframe ready. If you have drawings, the team can arrange to review them after replying.
Browse the projects by category. Each entry sets out its location, scope, year and source.