MILTON萬昇建築工程
Repair and building services

Air conditioning and building services

Coordinate air conditioning, fire services, plumbing and electrical work around existing systems and occupants.

Ceiling model on an oak base, with a metal duct bend, two insulated pipes and brass-coloured hangers beneath the slab.
A cutaway ceiling model brings a rectangular air duct and two insulated pipes into view beneath the slab.

Scope of service

Plant replacement involves access, interruption windows and interfaces with adjoining trades. Identify the equipment, the floors it serves and when those services must remain available. The project consultants and relevant registered trades can then agree the boundaries of each package.

Hospital cooling and water-park services

The 2019 Queen Mary Hospital entry identifies a central air-conditioning installation. At Water World Ocean Park, the record covers both fitting out and building services. The two scopes illustrate how the equipment interfaces with its room, finishes and neighbouring trades.

Milton company profile, September 2025, pp. 49, 112–113 and 183.

Service illustrations and project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team