MILTON萬昇建築工程
Repair and building services

Infrared surveys and water seepage

Interpret thermal patterns alongside visible staining and the times when water appears.

A horizontal joint and stain on a model façade beside an orange, violet and blue simulated thermal image.
A simulated thermal image picks out the line of a façade joint beside a model of the stained surface.

Scope of service

Staining may relate to a façade joint, a window surround, waterproofing or drainage. The profile describes a site visit to establish survey areas, followed by thermal imaging and a report explaining the observations. A difference in surface temperature is a clue. Weather, water use and the visible condition help explain it.

What changed before and after the rain?

Photographs from the same position before and after staining appeared, with a note of rainfall or water use, make a survey easier to interpret. A separate 2014 entry in the profile documents infrared inspection on Stonecutters Island.

Milton company profile, September 2025, pp. 51, 61–63 and 128–129.

Related collections

Service illustrations and project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team