Repair and building services
Waterproofing and drainage
Address podiums and local plant-room roof waterproofing, or renew drains serving a site or building.
Scope of service
Roofs, podiums and drain outlets are connected, although an appointment may cover only one of them. A marked-up plan of staining, ponding and routes that must remain open gives the team a starting point for the survey, access arrangements and handover.
A roof repair and a drain renewal
At Kwong Ming Court the documented work was local waterproofing to the roof of a podium plant room. Delia Memorial School required an urgent playing-field drain replacement. One brief identifies the affected roof area, the other the run of the drain and when the field can be accessed.
Milton company profile, September 2025, pp. 84, 99–100 and 116–117.
