Sports-ground drains at Delia Memorial School

Emergency replacement of ground drains serving the school sports area in Kwun Tong.

Drainage trench beside the school
An open drainage trench alongside the school wall.

Scope of work

Photographs show a length of opened ground and replacement pipework beside the sports area. The 2018 case sheet identifies emergency drain replacement and records completion within three days. The former website gives the same year and scope. An additional entry for the school premises in 2016–2018 appears elsewhere in the profile.

Project source Milton Construction Engineering Limited, 2025 company profile, pp. 99–100

Compact excavator at the sports ground
A compact excavator beside the sports-ground fence.
Existing drain exposed by excavation
An existing drain section and rubble exposed by excavation.
Replacement drainage pipes
Lengths of dark replacement pipe laid out side by side.

Photographs & drawings

Compact excavator working at the edge of a court
A compact excavator works along the court edge during the Delia school drainage project · Company profile, p. 99
Excavated trench and broken material beside the court
An excavated trench follows the sports-ground wall, with broken material piled alongside · Company profile, p. 100