MILTON萬昇建築工程

6 images

Delia school sports-ground drainage

Pages 99–100 record emergency drain replacement at the Kwun Tong school’s sports ground, from excavation to the pipework prepared for installation.

Project record · Sports-ground drains at Delia Memorial School
Drainage trench beside the school
An open drainage trench alongside the school wall · Company profile, p. 99
Compact excavator at the sports ground
A compact excavator beside the sports-ground fence · Company profile, p. 99
Existing drain exposed by excavation
An existing drain section and rubble exposed by excavation · Company profile, p. 99
Replacement drainage pipes
Lengths of dark replacement pipe laid out side by side · Company profile, p. 100
Compact excavator working at the edge of a court
A compact excavator works along the court edge during the Delia school drainage project · Company profile, p. 99
Excavated trench and broken material beside the court
An excavated trench follows the sports-ground wall, with broken material piled alongside · Company profile, p. 100
Back to the project gallery

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team