
Villa construction on Lok To Street
A construction record for a villa on Lok To Street, from concrete work to the formation of the interior.

Explore foundations beneath Hong Kong streets, hospital plant rooms and a hotel in Shenzhen. Find a case by place or scope and compare the site photographs with the project record.
Explore the directory
A construction record for a villa on Lok To Street, from concrete work to the formation of the interior.


80 case studies

MacDonnell Road, Hong Kong Island

Siu Lam, Tuen Mun

73–77 Lei Muk Road, Kwai Chung

Southern District, Hong Kong Island

City University of Hong Kong campus

Jordan, Kowloon

Ma Liu Shui, Sha Tin

Lantau Island, Islands District

Tseung Kwan O, New Territories

Tsuen Wan, New Territories
Ryer Construction Engineering Limited
Yuen Long, New Territories

Chek Lap Kok, Islands District

Tsing Yi, New Territories

Central, Hong Kong Island

Tseung Kwan O, New Territories

Kowloon Tong, Kowloon

Sheung Wan, Hong Kong Island
Ryer Construction Engineering Limited
Kowloon Tong, Kowloon
Ryer Construction Engineering Limited
Stubbs Road, Hong Kong Island
Ryer Construction Engineering Limited
West Kowloon Cultural District, Kowloon
Ryer Construction Engineering Limited
Wong Chuk Hang, Aberdeen
Ryer Construction Engineering Limited
Yuen Long, New Territories
Ryer Construction Engineering Limited
Tin Wan, Hong Kong Island
Ryer Construction Engineering Limited
Wan Chai, Hong Kong Island
Ryer Construction Engineering Limited
Sheung Wan, Hong Kong Island

Tai Kok Tsui, Kowloon

Siu Ho Wan, Lantau Island

Kwun Tong, Kowloon

Princess Margaret Road, Kowloon

Ma Liu Shui, Sha Tin

Pok Fu Lam, Hong Kong Island

Central, Hong Kong Island

Tsim Sha Tsui, Kowloon

South Bay, Hong Kong Island

Southern District, Hong Kong Island

Sha Tin, New Territories

Yuet Wah Street, Kwun Tong

Sai Kung, New Territories

Chek Lap Kok, Islands District

Tseung Kwan O, New Territories

MegaBox, Kowloon Bay

8 Sham Tsz Street, Sham Tseng

Kowloon Bay

Mei Tin Road, Tai Wai

114–116 Boundary Street, Kowloon

7–9 South Wall Road, Kowloon City

407–417 Shanghai Street, Mong Kok

15 Queen’s Road Central

181–183 Sai Yee Street, Mong Kok

23 Harbour Road, Wan Chai

3 Salisbury Road, Tsim Sha Tsui

23–29 Fung Tak Road, Wong Tai Sin

1 Sky Plaza Road, Chek Lap Kok

33 Wai Yip Street, Kowloon Bay

Repulse Bay, Hong Kong Island

49 Tai Wai Road, Tai Wai

Ground and first floors, Kingswood Ginza, Tin Shui Wai

700 Lai Chi Kok Road, Kowloon

Luen Fat House, 56–60 Kin Yip Street, Yuen Long

Nin Wah Road, Cheung Muk Tau, Sai Kung

1002 Jianshe Road, Luohu, Shenzhen

Mong Kok, Kowloon

Castle Peak Road, New Territories

Gateway Tower, Tsim Sha Tsui

Tsim Sha Tsui, Kowloon

Chinese YMCA of Hong Kong school premises

Lai Chi Kok Road, Kowloon

Kowloon and Hong Kong Island

Beach Road, Repulse Bay

Wong Nai Chung Road, Happy Valley

Canton Road, Mong Kok

Tsing Yi, New Territories

Elgin Street, Central

South Bay Road, Repulse Bay

132–134 Austin Road, Kowloon

Stanley Village Road, Stanley

402–404 Lockhart Road, Hong Kong Island

Ping Chong Road, Cheung Chau

100 Jervois Street, Sheung Wan

2–8 Chung On Street, Tsuen Wan