MILTON萬昇建築工程

Wong Chuk Hang, Aberdeen

Floor subdivision at Viva Place

Building subdivision at Viva Place, 36 Heung Yip Road, documented in photographs of the floor under construction and its partitioned interiors.

Curved glazed façade
Curved glazed façade

Scope of work

Ryer identifies this as its Aberdeen project at Viva Place on page 21 of its profile. From the street in Wong Chuk Hang the glazing wraps around a curved corner. Inside, the photographs show how rooms, doorways and passages relate to the daylight along the edge of the floor.

A floor behind a curved glazed façade

The glazing at Viva Place turns the corner on Heung Yip Road and continues along the outer edge of each floor. From just inside that edge there is a long view along the windows. The subdivision takes place inside this perimeter. The photographs show how the position of a room wall or a turn in the passage alters the point from which the street can be seen.

Partitions, doorways and the ceiling zone

Partitions are in place in some construction views, while other areas remain open at ceiling level and reveal parts of the services above. Another view shows several doorways leading into separate rooms. Looking through successive openings makes the connections between rooms and passages legible, alongside the different division of space for services above the occupied floor.

Company records

Page 202 of Milton’s 2025 profile also records subdivision works at Viva Place in 2024–2025. The photographs in this project album come from Ryer’s 2026 company profile.

Project source Ryer Construction Engineering Limited

Interior work area
Interior work area
Floor during subdivision work
Floor during subdivision work
Partitioned rooms and doorway
Partitioned rooms and doorway
Glazing and internal corridor
Glazing and internal corridor

Photographs & drawings

Services above an unfinished ceiling
Floor subdivision at Viva Place. Services above an unfinished ceiling · Company profile, p. 202
Workers fitting partitions alongside the windows
Floor subdivision at Viva Place. Workers fitting partitions alongside the windows · Company profile, p. 202
Linear openings and service positions in a ceiling
Floor subdivision at Viva Place. Linear openings and service positions in a ceiling · Company profile, p. 202
All projects

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team