MILTON萬昇建築工程

Sheung Wan, Hong Kong Island

Medical aesthetics clinic in Sheung Wan

An interior fit-out for a medical aesthetics clinic in Sheung Wan, with photographs of reception, waiting and treatment spaces.

Curved walls and seating in the reception area
Curved walls and seating in the reception area

Scope of work

The entrance passage leads to reception, with waiting seats, display shelves and an equipped room farther inside. Five views on page 17 of Ryer’s company profile pick up the curved surfaces and lighting from the publicly accessible entrance through to a more private room.

From the reception desk to the waiting seats

On entering the clinic, the white reception counter and the sign on the wall are the first identifiable features. A curved line of light rises gently across the wall above the seating. A closer photograph shows space behind the seats and planting alongside them. Together the views locate the waiting area relative to the entrance passage and the person approaching the desk.

The treatment room and the display wall

An articulated light, equipment and smooth wall surfaces identify the treatment room. In the public area, recessed shelving displays objects with light running along the shelves. Both spaces use a pale palette, but the details address different viewpoints, one close to the equipment and another at the wall beside the waiting seats. Both are visible in Ryer’s record of the fit-out.

Company records

Page 203 of Milton’s 2025 profile also records fit-out of a medical aesthetics centre in Sheung Wan in 2024–2025. The photographs in this project album come from Ryer’s 2026 company profile.

Project source Ryer Construction Engineering Limited

Clinical room equipment and wall finish
Clinical room equipment and wall finish
Waiting area seating and wall light
Waiting area seating and wall light
Reception desk and entrance corridor
Reception desk and entrance corridor
Display shelves and planting
Display shelves and planting

Photographs & drawings

Light-toned room with a work bench and shelving
Medical aesthetics clinic in Sheung Wan. Light-toned room with a work bench and shelving · Company profile, p. 203
White seating in front of a curving wall
Medical aesthetics clinic in Sheung Wan. White seating in front of a curving wall · Company profile, p. 203
Clinic lettering on an interior wall
Medical aesthetics clinic in Sheung Wan. Clinic lettering on an interior wall · Company profile, p. 203
All projects

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team