Tin Wan, Hong Kong Island
Sun Ying Industrial Centre lobby
A lobby refurbishment at 9 Tin Wan Close, with photographs of the entrance passage, lighting, walls and ceiling.
Scope of work
Gold lettering on the façade identifies Sun Ying Industrial Centre, the name also listed by the Rating and Valuation Department. Page 23 of Ryer’s profile defines the work as a lobby refurbishment and places photographs of the ceiling and walls under construction alongside the entrance passage with its lighting in place.
Two directions through an industrial entrance
Sun Ying Industrial Centre dates to 1988. Rows of industrial windows can be seen above its Tin Wan Close frontage. Turning into the entrance brings doors, notices and the way farther into the building into view at eye level. Another photograph looks along the timber-toned lobby wall and its lighting towards the passage beyond. The two directions follow the turn that a visitor makes when entering from the street.
Before the ceiling was closed
A site photograph shows a worker reaching the ceiling from a platform, and another captures the wall finish during installation. In the lobby view, vertical lights hang at different heights while slats extend along the ceiling. The sequence connects a finished wall to the ceiling, lighting and lower wall surfaces that meet it around the edges of this compact entrance.
Company records
Page 207 of Milton’s 2025 profile also records lobby refurbishment at Sun Ying Industrial Centre in 2024–2025. The photographs in this project album come from Ryer’s 2026 company profile.
Project source Ryer Construction Engineering Limited







