MILTON萬昇建築工程

5 images

Sun Ying Industrial Centre lobby

Ryer Construction Engineering Limited’s 2026 company profile records the lobby refurbishment at Sun Ying Industrial Centre in Tin Wan on page 23.

Project record · Sun Ying Industrial Centre lobby
Lobby wall finishes and lighting
Linear lights illuminate the finished lobby wall.
Industrial building exterior
The building name appears above the entrance to Sun Ying Industrial Centre.
Building entrance passage
The access passage and side doors lead into the building.
Lobby ceiling work area
An access platform stands beneath the lobby ceiling work area.
Wall finishes in progress
A worker attends to the wall beside unfinished surfaces.
Back to the project gallery

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team