MILTON萬昇建築工程

Project register

Search the residential, commercial, campus and building services works recorded in Milton’s company profile by place, scope or year.

Nearby buildings reflected in the curved glass of Viva Place in Aberdeen
Aberdeen · Viva Place exterior. The project involved internal subdivision.

Page numbers refer to the PDF pages of Milton’s 2025 company profile. Where the original table gives only a collective date range, the register labels it “Index coverage”.

107 records

Education, community and recreation

Project and locationScope of workYearProfile page
Granville Road Post OfficeGranville Road, Tsim Sha Tsui A Hongkong Post letter dated 12 December 2022 confirms Milton completed the reinstatement of Granville Road Post Office in Tsim Sha Tsui.202231
Floral Villas clubhouse and facilitiesFloral Villas, Sai Kung Refurbishment of the clubhouse and estate facilities.Index coverage
2006–2018
71
Buddhist Po Tai care homeBuddhist Po Tai care home Additions and alterations to existing premises.Index coverage
2006–2019
75
Delia Memorial School premisesKwun Tong, KowloonView project photos Pages 85–86 document work at the school and include site photographs. The sports-ground drain replacement is recorded separately on pages 99–100.2016–201885, 86
Hoi Ping Chamber of Commerce Primary School700 Lai Chi Kok Road, KowloonView project photosCase study · Alterations at Hoi Ping Chamber of Commerce Primary School Additions and alterations to existing premises.2022155
Helping Hand Father Sean Burke Care Home for the ElderlyNin Wah Road, Cheung Muk Tau, Sai KungView project photosCase study · Building refurbishment at Father Sean Burke Care Home Building refurbishment associated with mandatory window and building inspections, as described in the profile.2016157, 158
City University of Hong KongCity University of Hong Kong campusView project photosCase study · Flagpole replacement at City University of Hong Kong Replacement of campus flagpoles.2021–2022180
Island Christian AcademyChinese YMCA of Hong Kong school premisesView project photosCase study · Campus improvements at Island Christian Academy Improvements to school facilities.2021–2022181
LCSD play facilitiesKowloon and Hong Kong IslandView project photosCase study · LCSD play-equipment works in Kowloon and on Hong Kong Island Maintenance, repair and replacement of LCSD play equipment in Kowloon and on Hong Kong Island. A letter dated 12 June 2025 certifies substantial completion of specified works orders. The 2025 profile still listed the programme as under way.2024–33, 47, 77, 187

Building services, drainage and signs

Project and locationScope of workYearProfile page
Kam Fat BuildingStreet address unlisted Fire safety improvement works.Index coverage
2006–2018
71
Chevalier GardenMa On Shan, New Territories Replacement of water supply and drainage pipes.Index coverage
2006–2018
71
Kinho Industrial BuildingSha Tin, New Territories Works to internal and external walls, concrete structures, drains and the electrical supply, with items involving unauthorised works.Index coverage
2006–2019
72
Soundwill PlazaCauseway Bay, Hong Kong Island Sign refurbishment.Index coverage
2006–2021
76
Stonecutters Island facilitiesStonecutters IslandView project photos Infrared inspection and facilities refurbishment, documented on pages 128–129.2014128, 129
Rumsey Street steelwork and displayRumsey Street, Sheung WanView project photos Removal of steelwork and refurbishment of an LED display.2016134
Rooftop display at Times Tower391–407 Jaffe Road, Wan ChaiView project photos Refurbishment of a rooftop LED installation.2018135
Great Eagle Centre23 Harbour Road, Wan ChaiView project photosCase study · Display replacement and steelwork at Great Eagle Centre LED display replacement and refurbishment of its steelwork.201676, 136
Star House3 Salisbury Road, Tsim Sha TsuiView project photosCase study · Rooftop sign and LED refurbishment at Star House Refurbishment of a rooftop sign and LED installation.201876, 137
On Lok Building23–29 Fung Tak Road, Wong Tai SinView project photosCase study · Water tank and pump submissions at On Lok Building Plan submission for water tank and pump works.2016–2018138
Ko Shing Building58–72 Fuk Man Road, Sai KungView project photos Plan submission for water tank and pump works.2018139
Airport baggage conveyor1 Sky Plaza Road, Chek Lap KokView project photosCase study · Airport baggage conveyor and steel-frame maintenance Baggage conveyor works and repairs to structural steelwork.201272, 140
Yau Tong Industrial Building, Block 12 Shung Shun Street, Yau TongView project photos Signboard additions and alterations.201374, 149
Seapower Centre73–77 Lei Muk Road, Kwai ChungView project photosCase study · Emergency electrical system replacement at Seapower Centre Emergency replacement of the electrical system.2022186
Facility at Stanley BarracksStanley, Hong Kong Island Dismantling of a transmission tower.2024–202577, 201
58 Stanley Village RoadStanley Village Road, StanleyView project photosCase study · Drain replacement at 58 Stanley Village Road Ground drain replacement and refurbishment.2024–202577, 205

Residential buildings and common areas

Project and locationScope of workYearProfile page
Cambridge BuildingKwun Tong, Kowloon Emergency removal of a cantilevered canopy.Index coverage
2006–2018
71
Man King Building9–11 Bonham Strand West, Sheung Wan Works under the mandatory window inspection scheme.Index coverage
2006–2018
71
Nam Cheong Street and Tai Nan Street lobby80–82 Nam Cheong Street and 236 Tai Nan Street Lobby fit-out.Index coverage
2006–2018
71
23 Aberdeen StreetAberdeen Street, Sheung Wan Building repairs under the mandatory inspection scheme.Index coverage
2006–2018
71
4–12 Hoi Pong StreetHoi Pong Street, Sai Kung Mandatory building-inspection repairs at 4–12 Hoi Pong Street, Sai Kung. The owners’ letter records Milton’s appointment in 2017 and its handling of residents’ enquiries during the works.201732, 71
104 Man Nin StreetMan Nin Street, Sai Kung Building repairs and refurbishment.Index coverage
2006–2018
71
South MansionMacDonnell Road, Hong Kong IslandView project photosCase study · South Mansion façade refurbishment Building refurbishment associated with mandatory building and window inspections.201781, 82
Shung Ming Mansion114–116 Boundary Street, KowloonView project photosCase study · Building refurbishment at Shung Ming Mansion Building refurbishment associated with mandatory window and building inspections.201871, 118, 119
Hoi Sing Building7–9 South Wall Road, Kowloon CityView project photosCase study · Hoi Sing Building refurbishment Building refurbishment.201871, 120, 121
407–417 Shanghai Street407–417 Shanghai Street, Mong KokView project photosCase study · Refurbishment at 407–417 Shanghai Street Building refurbishment associated with mandatory window and building inspections.2016122, 123
Kwai Wah Court181–183 Sai Yee Street, Mong KokView project photosCase study · Kwai Wah Court refurbishment Building refurbishment associated with mandatory window and building inspections.2015–201671, 132, 133
Telford Gardens33 Wai Yip Street, Kowloon BayView project photosCase study · Repairs to two blocks at Telford Gardens Repairs on the floors of two estate blocks.200772, 141
37 Repulse Bay RoadRepulse Bay, Hong Kong IslandView project photosCase study · Building and drainage repairs at 37 Repulse Bay Road Repairs to internal and external walls, floors, drains and staircases.201372, 142
Pokfulam Gardens180 Pok Fu Lam RoadView project photos Additions and alterations to existing premises.201073, 145
Seasons Villas, houses 68 and 69233 Kam Tin Road, Yuen LongView project photos Additions and alterations to existing premises.201375, 153
Siu Yip HouseMong Kok, KowloonView project photosCase study · Siu Yip House refurbishment in Mong Kok Building refurbishment under the mandatory building inspection scheme in 2019–2022. A February 2022 letter from the owners’ corporation confirms Milton’s appointment as maintenance contractor through the Urban Renewal Authority’s tendering platform.2019–202236, 161, 162
Building on Lai Chi Kok RoadLai Chi Kok Road, KowloonView project photosCase study · Building refurbishment on Lai Chi Kok Road Whole-building refurbishment.2022184
165–167 Wong Nai Chung RoadWong Nai Chung Road, Happy ValleyView project photosCase study · Refurbishment at 165–167 Wong Nai Chung Road Building refurbishment.2024–202577, 192
1058 Canton RoadCanton Road, Mong KokView project photosCase study · Refurbishment at 1058 Canton Road Building refurbishment.2024–202577, 193
24 Elgin StreetElgin Street, CentralView project photosCase study · Refurbishment and structural works at 24 Elgin Street Building refurbishment and structural works, recorded as in progress in the September 2025 profile.2024–77, 196
2 South Bay RoadSouth Bay Road, Repulse BayView project photosCase study · Building inspection and structural works at 2 South Bay Road Mandatory building inspection and structural works, recorded as in progress in the September 2025 profile.2024–77, 199
Tai Chi Court132–134 Austin Road, KowloonView project photosCase study · Tai Chi Court refurbishment on Austin Road Building refurbishment.2024–202577, 204
Lok Chung Building402–404 Lockhart Road, Hong Kong IslandView project photosCase study · Lok Chung Building refurbishment on Lockhart Road Building refurbishment.2024–202577, 206
6 Ping Chong RoadPing Chong Road, Cheung ChauView project photosCase study · Major refurbishment at 6 Ping Chong Road, Cheung Chau Major refurbishment, recorded as in progress in the September 2025 profile.2024–77, 208
Kong Ling Building100 Jervois Street, Sheung WanView project photosCase study · Kong Ling Building refurbishment on Jervois Street Building refurbishment.2024–202577, 209

Construction, civil works and project management

Project and locationScope of workYearProfile page
Villa at Lok To YuenSiu Lam, Tuen Mun Detached villa and foundation works at Lok To Yuen, Siu Lam. A dated entry records site formation at the same property in 2018–2019.Index coverage
2006–2018
71, 78
1 Peak RoadPeak Road, Hong Kong Island Slope study and investigation.Index coverage
2006–2019
72
Cheung Wang EstateTsing Yi, New Territories Works and safety management.Index coverage
2006–2019
72
Eight villas in Tsing Lung TauTsing Lung Tau, Sham Tseng Project and safety management for eight villas at Tsing Lung Tau near Sham Tseng. An owner’s reference also describes slope investigation, design and construction.Index coverage
2006–2019
35, 72
Fraser Village housesYuen Long, New Territories Construction of sixteen villas.Index coverage
2006–2019
75
11 Verbena RoadVerbena Road, Yau Yat Chuen, Kowloon Villa construction.Index coverage
2006–2019
75
10 Perkins RoadJardine’s Lookout, Hong Kong Island Villa construction.Index coverage
2006–2019
75, 76
29–31 Tung Tau Wan RoadStanley, Hong Kong Island Villa construction.Index coverage
2006–2019
75, 76
23 Severn RoadThe Peak, Hong Kong Island Villa construction.Index coverage
2006–2021
76
5 Mun Fat LaneMun Fat Lane, Castle Peak Road, Tuen Mun Site formation at 5 Mun Fat Lane off Castle Peak Road in Tuen Mun, dated September 2014 in the index.201478
Hotel on Portland Street130–132 Portland Street, Kowloon Construction of a 44-room hotel at 130–132 Portland Street, recorded in September 2014.201478
Lo Tik Wan site formationLo Tik Wan, Lamma Island Site formation at Lo Tik Wan, Lamma Island, recorded in October 2014.201478
Ocean Pointe8 Sham Tsz Street, Sham TsengView project photosCase study · Project management at Ocean Pointe Project management. The index also describes construction and fit-out design management for three blocks.2017–201872, 93, 94
Dah Chong Hong façadesKowloon BayView project photosCase study · Façade refurbishment supervision at Dah Chong Hong Supervision of façade refurbishment.200772, 96
Mei Lam EstateMei Tin Road, Tai WaiView project photosCase study · Works and safety management at Mei Lam Estate Works supervision at the estate, with works and safety management also listed in the index.200972, 97, 98
432 Castle Peak RoadCastle Peak Road, New TerritoriesView project photosCase study · Villa construction at 432 Castle Peak Road Villa construction, recorded as in progress in the September 2025 profile.2020–166, 167
Beach Road slopeBeach Road, Repulse BayView project photosCase study · Slope refurbishment on Beach Road Slope refurbishment, recorded as in progress in the September 2025 profile.2024–77, 191
Cement works in Tsing YiTsing Yi, New TerritoriesView project photosCase study · Refurbishment of the cement works in Tsing Yi Plant refurbishment, recorded as in progress in the September 2025 profile.2024–77, 194

Commercial buildings, hotels and interiors

Project and locationScope of workYearProfile page
So Hong Commercial Building roof41–47 Jervois Street, Sheung WanCase study · So Hong Commercial Building Design and construction of roof waterproofing. Pages 84 and 210 separately record lobby works.Index coverage
2006–2019
72
1025–1037 King’s RoadKing’s Road, Quarry Bay Additions and alterations to existing premises.Index coverage
2006–2019
73
422–428 Castle Peak RoadCastle Peak Road, Cheung Sha Wan Additions and alterations to existing premises.Index coverage
2006–2019
74
388–414 Shau Kei Wan RoadShau Kei Wan Road, Hong Kong Island Additions and alterations to existing premises.Index coverage
2006–2019
74
Office at Shun Tak CentreShun Tak Centre, Sheung Wan Office fit-out for China Forestry.Index coverage
2006–2021
76
571 Fuk Wa StreetCheung Sha Wan, Kowloon Fit-out works at 571 Fuk Wa Street, Cheung Sha Wan, recorded in September 2014.201478
The Peninsula lobbyTsim Sha Tsui, KowloonCase study · Refurbishment at The Peninsula Hong Kong The index dates lobby design and construction management at The Peninsula to November 2010. The hotel refurbishment in 2018–2019 has a separate case sheet.201078, 177, 178
Shangri-La Shenzhen health room and lobbyShenzhenCase study · Health room and lobby design management at Shangri-La Shenzhen The index records health-room and lobby design and construction management in December 2011. A separate sheet records similar work at the hotel in 2015–2016.201178, 159, 160
B&Q at MegaBoxMegaBox, Kowloon BayView project photosCase study · Design and fit-out of the B&Q store at MegaBox The retail entry and register identify B&Q at Enterprise Square Five, levels 3–4, with consultancy, interior design and fit-out (pp. 72, 91–92).200672, 91, 92
Edinburgh Tower15 Queen’s Road CentralView project photosCase study · Alterations and interior fit-out at Edinburgh Tower Additions, alterations and interior fit-out.2017126, 127
Wellcome in Tai Wai49 Tai Wai Road, Tai WaiView project photosCase study · Alterations to the Tai Wai Road Wellcome store Additions and alterations to existing premises.2018143
Jockey Club betting branch in Tin Shui WaiGround and first floors, Kingswood Ginza, Tin Shui WaiView project photosCase study · Improvements at the Kingswood Ginza betting branch Improvements to the betting branch.2013–201473, 144
17–19 Ashley RoadAshley Road, Tsim Sha TsuiView project photos Additions and alterations to existing premises.201073, 145
8 Tai Yuen StreetTai Yuen Street, Wan ChaiView project photos Additions and alterations to existing premises.201073, 145
Kin Hing Industrial Building17 Shek Kin Street, Kwai ChungView project photos Additions and alterations to existing premises.201073, 146
Mee King Building on Nathan Road458–460 Nathan RoadView project photos Additions and alterations to existing premises.201173, 146
Selwyn Factory Building404 Kwun Tong Road, Kwun TongView project photos Additions and alterations to existing premises.201173, 146
PCCW shop in Central23 Wellington Street, CentralView project photos Additions and alterations to existing premises.201273, 147
Tak Wing Building52 Kau Yuk Road, Yuen LongView project photos Additions and alterations to existing premises.201273, 147
QRE Plaza202 Queen’s Road East, Wan ChaiView project photos Additions and alterations to existing premises.201273, 147
21 Tung StreetTung Street, Sheung WanView project photos Additions and alterations to existing premises.201273, 148
Wing Fat Building840–844 Canton RoadView project photos Additions and alterations to existing premises.2012148
Sha Tin Plaza21–27 Sha Tin Centre Street, Sha TinView project photos Additions and alterations to existing premises.2012148
Building at 8C O’Brien Road8C O’Brien Road, Wan ChaiView project photos Additions and alterations to existing premises.201374, 149
Wai King Building169 Ngau Tau Kok RoadView project photos Additions and alterations to existing premises.201374, 149
PCCW shop in Tsuen Wan280 Sha Tsui Road, Tsuen WanView project photos Additions and alterations to existing premises.201274, 150
268 Lai Chi Kok RoadLai Chi Kok Road, Sham Shui PoView project photos Additions and alterations to existing premises.201374, 150
Lin Wah Building, Yuen Long161 Castle Peak Road, Yuen LongView project photos Additions and alterations to existing premises.201374, 151
Bonjour Tower3 Yuk Yat Street, To Kwa WanView project photos Additions and alterations to existing premises.201374, 151
V city83 Tuen Mun Heung Sze Wui Road, Tuen MunView project photos Additions and alterations to existing premises.201374, 151
Wo Shing BuildingSiu Wo Street, Tsuen WanView project photos Additions and alterations at Wo Shing Building on Siu Wo Street, Tsuen Wan. The works index specifies ground-floor shops 5–6.201374, 152
Kaiser Estate37–45 Man Yue Street, Hung HomView project photos Additions and alterations to existing premises.201274, 152
PCCW building on Leighton Road38 Leighton Road, Causeway BayView project photos Additions and alterations to existing premises.201375, 152
PCCW exchange in Yuen LongYuen Long, New TerritoriesView project photos Additions and alterations to existing premises.201375, 154
PCCW exchange in Tsuen WanTsuen Wan, New TerritoriesView project photos Additions and alterations to existing premises.201275, 154
Modern Beauty in Yuen LongLuen Fat House, 56–60 Kin Yip Street, Yuen LongView project photosCase study · Modern Beauty shop alterations in Yuen Long Additions and alterations to existing premises.201375, 156
Shangri-La Shenzhen1002 Jianshe Road, Luohu, ShenzhenView project photosCase study · Health room and lobby design management at Shangri-La Shenzhen Design and construction management for a health room and lobby spaces.2015–2016159, 160
Nomura’s Hong Kong officeGateway Tower, Tsim Sha TsuiView project photosCase study · Office fit-out for Nomura’s Hong Kong branch Office fit-out. The index on page 76 identifies Gateway Tower 2.2019–202076, 172, 173
The Peninsula Hong KongTsim Sha Tsui, KowloonView project photosCase study · Refurbishment at The Peninsula Hong Kong Hotel refurbishment.2018–2019177, 178
PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team