Building on Lai Chi Kok Road

Whole-building refurbishment.

Project record · Building refurbishment on Lai Chi Kok Road
Exposed reinforcement on Lai Chi Kok Road
Reinforcement exposed by spalled concrete at the Lai Chi Kok Road building · Company profile, p. 184View register entry
Street elevation wrapped in scaffold netting
Building on Lai Chi Kok Road. Street elevation wrapped in scaffold netting · Company profile, p. 184
Milton construction banner attached to the façade scaffolding
Building on Lai Chi Kok Road. Milton construction banner attached to the façade scaffolding · Company profile, p. 184
Protective netting running down to the street-facing levels
Building on Lai Chi Kok Road. Protective netting running down to the street-facing levels · Company profile, p. 184
A worker examining the interior beneath a stripped ceiling
Building on Lai Chi Kok Road. A worker examining the interior beneath a stripped ceiling · Company profile, p. 184
Window rows on the building and its neighbours
Building on Lai Chi Kok Road. Window rows on the building and its neighbours · Company profile, p. 184
Linear recess in an exposed concrete surface
Building on Lai Chi Kok Road. Linear recess in an exposed concrete surface · Company profile, p. 184
Reinforcing mesh exposed at the surface of the concrete
Building on Lai Chi Kok Road. Reinforcing mesh exposed at the surface of the concrete · Company profile, p. 184
Local exposed repair area along a soffit edge
Building on Lai Chi Kok Road. Local exposed repair area along a soffit edge · Company profile, p. 184
Exposed concrete repair areas beside a staircase and red handrail
Building on Lai Chi Kok Road. Exposed concrete repair areas beside a staircase and red handrail · Company profile, p. 184
Red handrail crossing a patch of exposed concrete
Building on Lai Chi Kok Road. Red handrail crossing a patch of exposed concrete · Company profile, p. 184
Crossing reinforcement exposed on the underside of a slab
Building on Lai Chi Kok Road. Crossing reinforcement exposed on the underside of a slab · Company profile, p. 184