Milton Construction Engineering Limited
Our founders
Co-founder and Managing Director
Dr Wong Tin Hei
黃天喜博士
Dr Wong Tin Hei is a co-founder of Milton Construction Engineering Limited. The company profile identifies him as Managing Director and company licence holder and records more than forty years of construction experience.

Construction management
Contracts, sites and building maintenance
Dr Wong worked as a contracts manager and a site manager for major building contractors. He also managed projects for a property developer and worked as an engineering consultant at a building maintenance consultancy.
Milton company profile, company background and Dr Wong’s career history, pp. 2 and 5.
Education and qualifications
Civil engineering, construction management and economics
Dr Wong holds a BSc in Civil Engineering, an MSc in Construction Management and Economics, an MBA and a PhD in Engineering Management. On 5 August 2002, the Architecture and Surveying Institute admitted him as a member with the designation Corporate Building Surveyor.
Milton company profile, career history and professional qualifications, pp. 5, 230, 231, 235 and 239.
Two years from January 2011
Service on the Minor Works Contractors Registration Committee
Dr Wong was reappointed to the Minor Works Contractors Registration Committee Panel and the Minor Works Contractors Registration Committee for two years from 1 January 2011. The committee assisted the Building Authority in considering applications relating to minor works contractors.
Milton company profile, Buildings Department reappointment letter under section 6 of the Building (Minor Works) Regulation, p. 240.
2017
Building maintenance at Verdun Villa
The owners’ corporation at Verdun Villa, 8 Ede Road, Kowloon Tong, addressed its letter about the 2017 building maintenance works to Dr Wong as engineer and to the project manager. It commended Milton’s management and site teams for responding promptly to complaints and following them up.
Milton company profile, letter from the owners’ corporation of Verdun Villa, p. 34.
2025 company profile
Company leadership and site safety at Milton
Milton’s profile identifies Dr Wong as Managing Director, company licence holder and Registered Professional Engineer. Its engineering team directory also lists him as Safety Manager and as a safety officer registered with the Labour Department.
Milton company profile, company background, board and engineering team, pp. 2–4 and 25. Milton confirms his role as co-founder.
Engineering and community
Enoch Wong
黃以諾
Founder and Project Director
A building site beside a working studio
At TVB City, the newsroom and studios kept operating while a new workshop went up nearby. In his project report, Enoch Wong describes a routine decision on site. When tender drawings, construction drawings or a specification left a point open, the team put a question in writing to the architect and consultants, then passed the confirmed revision to the trades doing the work.
Wong’s route from construction safety training through logistics, marketing and civil engineering took him from the classroom to the site and the boardroom. A radio interview preserves his own voice. Professional journals, event programmes and community records show other parts of the same career.
Interviews, coverage and the public record
A radio interview on running a construction brand, trade publications and listed-company announcements give different perspectives on Wong’s professional life.
A radio conversation about Milton
Speaking as Milton’s project director, Wong describes refreshing the company mark around 2:15 in part one. Part two opens with an owner receiving a building inspection notice, and the sequence from inspection to report and repairs. Around 3:10 he discusses showing clients comparable projects online. Both parts of the original Cantonese broadcast are available.
Away from the site, an endurance race at Sepang
In the 300 km race at round four of the Malaysian Championship Series, Wong and co-driver Tse Ka Hing shared car 211 for Project S. The final classification from Sepang International Circuit placed them first in the SP 2 V class.
Behind the Lo Pan Temple anniversary
The 140th-anniversary programme lists Wong on the organising group for the Lo Pan Festival banquet and the first Outstanding Craftsman Lo Pan Awards. The awards recognised frontline work across five trades, including plastering, steel fixing and curtain wall installation.
A board appointment at Jiyi Holdings
MarketScreener carried the news of Wong’s board appointment. Jiyi Holdings’ announcements filed with HKEX establish the full term. He served as an independent non-executive director and Audit Committee member from 23 February to 25 March.
Construction careers in the Academy’s fellowship profile
The Social Enterprise Research Academy profiled Wong’s engineering and community work in its fellowship publication. It also recorded his interest in helping young people learn about careers in construction. The publication includes profiles in Chinese and English.
A visit to the Resource Centre for the Deafblind
The Diamond Lions Club’s bulletin records Wong taking part as club president in a visit to the Hong Kong Society for the Blind’s Resource Centre for the Deafblind. Members delivered protective supplies and spoke with service users about life during the pandemic.
A role on the young engineers’ committee
Issue 58 of Plane News names Wong as assistant honorary secretary of the 2016–18 Committee of Young Engineers. The same roster places him in its National and Hong Kong Development Focus Group.
Education and appointments
From the site to engineering management
Enoch Wong, Milton’s project director, studied business and civil engineering and managed the TVB City workshop extension. His reports and public appointments trace his career on site and in the industry.
2010–2012
From site training to two degrees
Wong completed the Class II minor works contractor training course for individuals at the Hong Kong Polytechnic University’s Industrial Centre in 2010. He earned a BBA in Logistics and Marketing from Curtin University in 2011 and a BSc in Civil Engineering from Bulacan State University in the Philippines in 2012. His engineering report dates his move to Milton to that same year.
Experience and training portfolio, pp. 4 and 17. Jiyi’s February 2024 announcement also records the Curtin degree.
2018–2025
Project and departmental leadership
His report describes managing the TVB City workshop extension. In 2021 the Social Enterprise Research Academy identified him as Milton’s project director and engineer. The 2025 Milton profile places him on its board and lists him as director and general manager of the engineering department. Its biographical page also introduces him as executive vice-chairman.
Personal project report, pp. 4–8. Milton company profile, 2025, pp. 3–4 and 6.
2022–2025
Advisory appointments
The Association of Greater Bay Area Professionals appointed Wong as an adviser for 2022–24. A separate appointment from the Hong Kong Institute of Environmentalists named him an honorary adviser from April 2023 to 30 April 2025.
Professional credentials and appointments file, pp. 12 and 25.
2021–2026
Continuing education in water, safety and contracts
In 2021 he attended a three-hour professional seminar on the four stages of the Dongjiang water supply extension to Hong Kong. In 2023 he completed the Hong Kong Institute of Construction’s pilot course on smart site safety supervision. In June 2026 AprimaHK recorded at least 40 hours of training and self-study and a pass in its NEC4 Engineering and Construction Contract project management assessment.
Professional credentials and course certificates, pp. 2, 31 and 36.
View the career timeline by year
- 2009
Training in construction safety
Completed training in construction safety supervision and obtained the Safety Supervisor Certificate (Construction).
Safety supervisor certificate, professional credentials file, p. 23.
- 2011
Logistics and marketing
Graduated from Curtin University with a Bachelor of Business Administration in Logistics and Marketing.
Enoch Wong’s engineering experience report, p. 21 of the collected portfolio.
- 2012
Civil engineering and the move to Milton
Earned a Bachelor of Science in Civil Engineering from Bulacan State University. His professional report records that he joined Milton that year.
Enoch Wong’s engineering experience report, p. 21 of the collected portfolio.
- 2018–2020
Project manager at TVB City
From March 2018 to September 2020, managed the programme and coordinated disciplines for the workshop block extension in Tseung Kwan O.
Enoch Wong’s engineering experience report, pp. 21–25 of the collected portfolio.
- 2020
Admission to the Hong Kong Institute of Construction Managers
On 15 December, the Hong Kong Institute of Construction Managers admitted Wong as a Member.
Institute membership certificate, professional credentials file, p. 45.
- 2023
Smart site safety supervision
On 25 November, completed the Hong Kong Institute of Construction’s 14-hour pilot course on safety supervision with a smart site safety system.
Hong Kong Institute of Construction certificate, professional credentials file, p. 31.
- 2026
Project management under the NEC4 contract
In June, completed AprimaHK’s course and examination in project management under the NEC4 Engineering and Construction Contract.
Course certificate dated 18 June 2026, professional credentials file, p. 2.
Field report
Extending a workshop beside working studios
TVB City, Tseung Kwan O, 2018–2020. Wong’s project report follows the new workshop from construction through to the occupation permit.
Sequencing the works
The new block stood beside the existing workshop. Foundations, superstructure, finishes and building services had to be coordinated in the master programme while nearby studios continued to operate. With news production running around the clock, the safety team made weekly site walks to review working methods and risks.
Enoch Wong’s engineering experience report, pp. 21–23 of the collected portfolio.
Reviewing progress each week
The design team tracked drawings, submissions and procurement. The site team checked actual progress against the master programme each week. When the architect issued a revised drawing, the team logged the revision and passed it to the affected trades.
Enoch Wong’s engineering experience report, pp. 22–24 of the collected portfolio.
Inspection and handover
The team coordinated the drawings and supporting documents needed for completion inspections. The Buildings Department issued the occupation permit on 22 September 2020.
Enoch Wong’s engineering experience report, pp. 24–25 of the collected portfolio.
Community and professional life
Club service with the Diamond Lions and events recorded by the Social Enterprise Research Academy trace Wong’s work beyond the construction site.
Event photographs from Milton’s 2025 company profile, pp. 264–265.
From club secretary to president
Wong served as secretary of the Diamond Lions Club of Hong Kong in 2019–20 and as president the following year. On 22 October 2020 he and the founding president led club members at a meal service at the A-YMCA in Shek Kip Mei Estate.
Lions’ September–October 2019 bulletin and 2020 club activity record.
Fellowship and the construction sector
The Social Enterprise Research Academy conferred a Fellowship on Wong in 2020. Its 2021 brochure profiled his community service. The Hong Kong Registered Contractors Association also named him as a committee member in its account of the Lu Pan Temple’s 140th anniversary in 2024.
Fellowship certificate, professional credentials file, p. 39. SERA 2021 brochure, PDF pp. 30 and 116. Hong Kong Registered Contractors Association, January 2024.



