Kowloon Tong, Kowloon
Verdun Villa façade repairs
Façade repairs at Verdun Villa, 8 Ede Road, documented in photographs of the scaffolding and exposed elevations.
Scope of work
The Rating and Valuation Department identifies 8 Ede Road as Verdun Villa and records the building’s completion in 1968. The joint construction archive gives the same street number and uses a variant of its Chinese name, 惠苑. The address links the written entry to two surviving sets of photographs of the residential building during the façade repairs.
Following the windows around the corner
A view taken at an angle from Ede Road shows two elevations meeting at a corner, with rows of windows in the pale walls and trees along the street. The scaffold wrapping conceals much of the wall detail, but the silhouette and corner remain recognisable. Following the window rows around that corner provides a way to match the exposed building to the photographs taken during the repairs.
A record of the scaffolded elevation
One photograph records scaffolding reaching across several storeys, its mesh returning around the perimeter of the building. Another reveals more of the wall, including the recesses around the windows and the horizontal lines between floors. The joint register identifies the repairs as a 2014–2015 project and lists HK$3.3 million, giving the paired street views a place in the building’s maintenance history.
Dates in the project records
Milton lists these works in its mandatory building inspection programme records. The joint website dates exterior repairs at 8 Ede Road to 2014–2015. Page 95 of Milton’s profile separately describes building refurbishment in 2016–2018. An owners’ letter on page 34 records work at the property in 2017.
Project source Milton / Ryer joint archive View project record