MILTON萬昇建築工程

Kowloon Tong, Kowloon

Devon Road villa refurbishment

Refurbishment of a Kowloon Tong villa, seen from its courtyard and stone-clad corners through to a timber-finished internal stair.

Villa façade and courtyard
Villa façade and courtyard

Scope of work

Page 18 of Ryer’s company profile gives 2024 as the start of the Devon Road villa refurbishment. A wide view across the courtyard sits alongside close studies of grilles and wall corners, allowing the proportions of the villa to be read against the components along its façade.

Reading the façade from the courtyard

The pool in the courtyard provides a viewpoint at some distance from the house. It takes in the windows at different levels, projections from the façade and openings facing the garden. Moving closer to the corner brings the individual cladding joints, depth of the window reveals and metal grilles into view. The sequence records the same exterior at markedly different scales.

The stair and timber finishes indoors

Indoors, the cool tones of the stone cladding give way to timber around the stair. The joinery follows the flight upwards, where the edge of the landing and the opening above show how the levels connect. This photograph adds a part of the refurbishment invisible from either the pavement or the courtyard and makes the changes in level legible within the room.

Company records

Page 190 of Milton’s 2025 profile also records Devon Road villa refurbishment, beginning in 2024 and listed as under way in that edition. The photographs in this project album come from Ryer’s 2026 company profile.

Project source Ryer Construction Engineering Limited

Stone-clad corner of the villa
Stone-clad corner of the villa
Villa windows and entrance
Villa windows and entrance
Façade detail and window grille
Façade detail and window grille
Interior staircase and timber finishes
Interior staircase and timber finishes

Photographs & drawings

All projects

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team