MILTON萬昇建築工程

3 images

Verdun Villa, Ede Road

Photographs from the former Milton and Ryer joint project archive. Two original comparison panels show different sides of the exterior during and after scaffolding.

Project record · Verdun Villa façade repairs
Verdun Villa under scaffold and after its removal
A side view with protective netting is paired with the exposed façade above the trees.
Before-and-after corner views at Verdun Villa
The pair records the window bays from a similar position with and without scaffold.
Pale Verdun Villa elevation from the driveway
The driveway opens towards Verdun Villa’s rows of windows and the trees inside the site · Company profile, p. 95
Back to the project gallery

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team