Stubbs Road, Hong Kong Island
Victoria Height car park refurbishment
Car park refurbishment at 43A Stubbs Road, illustrated by the parking bays, a cordoned-off area and an exposed concrete surface.
Scope of work
Long horizontal openings mark the parking levels at the foot of the residential building. The Rating and Valuation Department lists the address as Victoria Height and dates the building to 1980. Page 19 of Ryer’s profile identifies the commission as car park refurbishment and includes both the exterior setting and the internal work area.
Locating the parking levels from Stubbs Road
From the road, the residential tower can be distinguished from the lower car park with its long horizontal openings. The interior photograph takes the viewer underneath the floor slab and into the parking bays. Reading the exterior and interior together places the refurbishment within the larger property and shows the headroom and circulation space at vehicle level.
A local detail in the concrete
The close-up shows a patch of opened concrete with a row of reinforcing bars visible beneath its surface. A separate photograph shows cones and notices arranged around a work area. Moving from the exterior to the parking bay and then to the exposed patch gives three reference points for anyone comparing a later inspection with this set of site photographs.
Company records
Page 200 of Milton’s 2025 profile also records car park refurbishment at 43A Stubbs Road in 2024–2025. The photographs in this project album come from Ryer’s 2026 company profile.
Project source Ryer Construction Engineering Limited







