Yuen Long, New Territories

Carmine Court slope repairs

Slope repairs at Carmine Court in Yuen Long, with views of the excavation, steel components and working platform.

Slope repair work area
Slope repair work area

Scope of work

Page 22 of Ryer’s profile dates the start of the Carmine Court slope repairs to 2025. The working area extends along the hillside. The platform, exposed slope and vegetation at the top occupy distinct levels in the wide view. Closer photographs record the earth and steel visible where the ground has been opened up.

A level place to work on a sloping site

The wide view follows the length of the slope and the temporary platform alongside it. Horizontal rails stand out against the inclined ground. A person in a closer photograph gives a sense of scale to the working face and the distance from the platform. Access, the exposed ground and places for materials sit at visibly different levels across this site.

Exposed ground and steelwork

Close views record an opening in the ground, the surrounding soil and visible steel. In a separate frame, steel components are laid out side by side with their ends in view. Another shows a worker using a tool at the slope face. Taken together with the platform view, these images record the working environment at the site Ryer identifies as a slope repair project.

Company records

Page 212 of Milton’s 2025 profile also records slope repairs at Carmine Court in Yuen Long, beginning in 2025 and listed as under way in that edition. The photographs in this project album come from Ryer’s 2026 company profile.

Project source Ryer Construction Engineering Limited

Excavation on the slope
Excavation on the slope
Steelwork for slope repairs
Steelwork for slope repairs
Work platform along the slope
Work platform along the slope
Worker on the slope face
Worker on the slope face

Photographs & drawings

Reinforcement connection below the concrete surface
Carmine Court slope repairs. Reinforcement connection below the concrete surface · Company profile, p. 212
Work marker beside the opened slope surface
Carmine Court slope repairs. Work marker beside the opened slope surface · Company profile, p. 212
Colour-marked ends of structural members
Carmine Court slope repairs. Colour-marked ends of structural members · Company profile, p. 212