MILTON萬昇建築工程

Wan Chai, Hong Kong Island

Ming Fung Building drainage works

Drainage work at 128–150 Wan Chai Road, with site records of the excavation and the local reinstatement of the surface.

Exterior of Ming Fung Building
Exterior of Ming Fung Building

Scope of work

Page 24 of Ryer’s profile establishes the position from the street and the building entrance before moving down to the opened drain. The sequence narrows from a large frontage to a small area at ground level, ending with a view of the reinstated surface at the work location.

Locating a small opening on a long frontage

Completed in 1969, Ming Fung Building extends along numbers 128–150 on Wan Chai Road, above a row of street-level premises. A view of the entrance and building name provides a recognisable point of reference for the intervening ground works. The opening is small in relation to the long frontage, making the entrance and exterior images especially valuable when locating the close-ups on the street.

The drain while exposed and after reinstatement

With a local section opened, the drain, the edge of the existing pavement and the tools used at the location are visible together. Another view records the reinstated surface. Once the ground is covered, these below-surface features are hard to identify from the street. Keeping the open and reinstated views together preserves a reference for a future inspection at this spot.

Company records

Page 198 of Milton’s 2025 profile also records drainage works at Ming Fung Building in 2024–2025. The photographs in this project album come from Ryer’s 2026 company profile.

Project source Ryer Construction Engineering Limited

Building entrance
Building entrance
Drain repair work area
Drain repair work area
Exposed drainage channel
Exposed drainage channel
Reinstatement at the work area
Reinstatement at the work area

Photographs & drawings

Corner elevation from a second street viewpoint
Ming Fung Building drainage works. Corner elevation from a second street viewpoint · Company profile, p. 198
Drain connection within an excavation
Ming Fung Building drainage works. Drain connection within an excavation · Company profile, p. 198
Inspection opening and the surrounding pavement
Ming Fung Building drainage works. Inspection opening and the surrounding pavement · Company profile, p. 198