Kwong Ming Court podium waterproofing

Local waterproofing to the roofs of service rooms on the podium at 108 Po Hong Road, Tseung Kwan O.

Archive photographs showing a residential block at Kwong Ming Court and a raised access platform
Archive photographs showing a residential block at Kwong Ming Court and a raised access platform

Scope of work

The works description locates the repair at three levels of detail. It identifies the estate, the podium within it and the roofs of individual service rooms on that podium. Keeping these references together gives the estate team a practical way to find the relevant record when inspecting the same area again.

A separate roof above the podium

An estate podium forms one surface, while the service rooms built on it introduce a second set of roofs above. The project sheet locates the waterproofing on parts of those smaller roofs. For someone returning to the site, the roof edge, adjacent wall and drainage points provide references for identifying a location on a sketch and relating it to the larger podium below.

The written scope and the access photograph

The original site paired an upward view of the housing block with a raised access platform near the building. The image preserves the setting, while the written entry identifies the smaller area assigned for waterproofing. Together they give a year, 2018, a recorded works value of HK$2.3 million and a description precise enough to distinguish the service-room roofs within a large estate.

Project source Milton / Ryer joint archive View project record

Photographs & drawings

Looking up between the residential blocks at Kwong Ming Court
The window bands of Kwong Ming Court frame a strip of sky above the residential courtyard · Company profile, p. 116
Scissor platform beside the residential façade
A scissor platform gives the crew access to the lower residential façade at Kwong Ming Court · Company profile, p. 116
Temporary barriers outside the residential podium entrance
Yellow barriers stand outside a podium entrance, below the residential elevation at Kwong Ming Court · Company profile, p. 116