Tsing Yi, New Territories
QCOB Association Secondary School
Refurbishment of indoor, outdoor and pool facilities at the school.
Scope of work
The school is at 1 Tam Kon Shan Road, Tsing Yi. The joint project archive records refurbishment to the indoor and outdoor facilities and the swimming pool of Queen’s College Old Boys’ Association Secondary School.
The school block and the open-air pool
At 1 Tam Kon Shan Road in Tsing Yi, a long school wing stands beside an open-air pool, with the hillside beyond. From above, the lanes run the length of the rectangular pool beside the school circulation areas. This view of the campus brings together the indoor, outdoor and pool facilities named in the brief and gives a reference point for the closer refurbishment photographs.
The empty pool and the internal stair
One photograph shows the pool drained, its dark lane markings distinct against the pale basin. Another turns inward to a school stair landing and the handrail along its wall. An exterior view follows a row of windows on the long wing, with trees close to the building. The joint archive dates the refurbishment to 2016 and records a works value of HK$3.5 million.
Project source Milton / Ryer joint archive View project record



