MILTON萬昇建築工程

9 images

Queen’s College Old Boys’ Association Secondary School

Photographs from the former Milton and Ryer joint project archive. The school’s refurbishment record includes its teaching block, corridors, stairwell and pool.

Project record · QCOB Association Secondary School
Elevated view of the school and swimming pool
The teaching block and pool sit below the green hills of Tsing Yi.
School façade viewed from the street
Rows of classrooms extend across the main elevation.
Chinese school name at the entrance
The name plaque on the entrance wall identifies the school.
Teaching block behind mature trees
A side view follows the long run of classroom windows.
School corridor with bamboo scaffolding
Temporary scaffolding follows the open side of the corridor.
Pool basin and lane markings viewed from above
The elevated archive view shows the lane markings in the pool basin.
Upper school floors and rooftop safety netting
Netting follows the roofline above the upper-level work area.
School stair tower and windows
The view up from the trees frames the corner and vertical glazing.
Interior stair rail and wall displays
A wall-mounted handrail follows the internal stair between landings.
Back to the project gallery

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team