Tseung Kwan O, New Territories

TVB City Workshop Block

A two-storey workshop extension beside an operating television studio.

TVB City site in Tseung Kwan O, from the project archive
TVB City site in Tseung Kwan O, from the project archive

Scope of work

The scope included foundations, superstructure, finishes and building services. Project manager Enoch Wong coordinated contractors, consultants and site operations. The project report records the occupation permit in September 2020.

Two new storeys beside an existing workshop

The site at 77 Chun Choi Street already housed the broadcaster’s main block, variety and drama studios and a workshop. The new two-storey extension was positioned immediately beside the existing workshop. In his project report, Enoch Wong records his role as Milton’s project manager from March 2018 to September 2020. His account follows the contract from foundations and superstructure to architectural finishes and mechanical and electrical installations.

Working beside a round-the-clock broadcaster

Broadcast and news operations continued around the clock on the campus. Housekeeping and the condition of the site boundary mattered to people in the neighbouring studios. Wong describes weekly safety and environmental walks with the internal safety team. Subcontractors brought their inspection records to the project meeting and discussed work procedures with site and safety staff, including the effects of a task on workers and other people nearby.

What happened after a drawing was issued

New drawings issued under an architect’s instruction were registered, checked and sent to the relevant subcontractors. The team discussed details shared by several trades in site workshops and kept written questions and replies where clarification was needed. Materials, shop drawings and method statements went to the architect for review. Weekly comparisons of actual progress against the master programme helped relate outstanding information to the next activities on site.

Bringing site and design information together

Wong divided the project work between a design team and a site operations team. The first dealt with technical issues, submissions and procurement in consultation with the designers. The second used site walks and progress meetings to identify problems in the field. Requests for information brought discrepancies back to the architect or consultants for a written decision. The meetings also gave the people who would operate and maintain the workshop a place to raise practical requirements.

From site records to an occupation permit

For the occupation permit, the project manager worked with the architect, engineers and subcontractors to assemble final statutory drawings, material test reports and certificates, and to coordinate the Buildings Department inspection. The original website entry was written while construction was in progress. Wong’s later account carries the story through to the Buildings Department’s issue of the occupation permit on 22 September 2020.

Project source Milton / Ryer joint archive View project record

Recorded phases of work

Site formation for the new building
2018–2019 · Profile p. 78

Photographs & drawings

Orange workshop elevation at TVB City
Orange cladding and a continuous band of windows at the TVB City workshop.
Projecting workshop canopy
Projecting orange canopy above a work area outside the workshop.
Unfinished workshop ceiling
Exposed overhead components in a large interior under construction.
Concept of the workshop block and adjoining link
The concept uses a two-storey block and elevated link to illustrate how the spaces could connect.
Concept of a workshop frame under construction
An unfinished frame and scaffolding illustrate the structural stage.
Concept elevation of the workshop building
Concept view of the external wall and two rows of windows.
All projects

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team