MILTON萬昇建築工程

Jordan, Kowloon

Shanghai Street Building

Construction of a single-block building at 16–18 Shanghai Street, Jordan.

Façade of the single-block building in Shanghai Street
Façade of the single-block building in Shanghai Street

Scope of work

The project is recorded as a single-block building on an urban site in Jordan. Archived photographs show the construction stage and the façade in its street setting.

A narrow frontage in Jordan

Seen from the opposite pavement on Shanghai Street, the building rises between existing neighbours. Green mesh outlines the street frontage in the construction photograph. In the later view, a pale elevation, rows of windows and projecting elements make the building identifiable all the way up. Keeping the pavement as the reference point makes it possible to compare both views at the scale of the street.

From reinforcement to the outer wall

A close site photograph picks out vertical reinforcement crossed by horizontal bars, with the surrounding walls of the site still visible behind the assembly. A second photograph looks through the scaffold towards window openings and the outer face of the wall. Together they document stages that disappear behind the finished façade and explain why the archive includes such different views of a single building.

Identifying the right Shanghai Street project

Several Shanghai Street addresses appear in the company’s records. The Jordan entry identifies numbers 16–18 as the site of a single new building in 2016–2017 and records a works value of HK$76 million. A photograph taken from an interior window adds a view out from the floor to the city, complementing the much more familiar view of the building from below.

Scope in the works index

The company profile’s works index includes the single-block building and its central air conditioning.

Project source Milton / Ryer joint archive View project record

Recorded phases of work

Site formation
2016–2017 · Profile p. 78
Shanghai Street exterior during construction
Shanghai Street exterior during construction
Reinforcement works at the Shanghai Street site, from the project archive
Reinforcement works at the Shanghai Street site, from the project archive

Photographs & drawings

Upward view of the upper floors on Shanghai Street
A second perspective from the original comparison panel looks up the building.
Floor-height windows overlooking neighbouring roofs
Daylight enters a finished room through full-height glazing.
Windows behind bamboo scaffolding and netting
The scaffold follows the building face and its window openings.
All projects

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team