How the company described its early work
Milton was incorporated in Hong Kong in 2005. A company homepage preserved in 2017 describes civil and building works and gives considerable space to maintenance and owners’ responsibility for building condition. One featured address was 37 Repulse Bay Road. Its 2013–2014 entry names internal and external walls, floors, drainage and stairs. The work concerned parts of a residence its occupants would pass or rely on every day.
What changes from one address to the next
The same earlier site lists improvements at the Nin Jiom factory, 50 Wang Lee Street in Wang Chau, Yuen Long, in 2013–2014. A later joint record lists a new single-block building at 16–18 Shanghai Street in 2016–2017. The factory photographs include its existing exterior. The Shanghai Street views range from reinforcement work to the façade in the street. Placing the images back at their addresses gives quite different meanings to the broad heading of construction.
Read the project name together with the scope
Later editions of the website presented a joint Milton and Ryer portfolio. Ryer also published its own company profile and selected works. The source shown on each project page identifies where the entry appeared. Some entries concern a floor, a section of wall or a facility inside a larger building. At Chek Lap Kok, for instance, the recorded place is SuperTerminal 1 and the category is additions and alterations. Those details establish how the facility pictured relates to the work described.
