MILTON萬昇建築工程

Yuen Long, New Territories

Nin Jiom Manufactory

Improvement works at the industrial premises at 50 Wang Lee Street, Yuen Long.

Exterior of the Nin Jiom premises in Yuen Long
Exterior of the Nin Jiom premises in Yuen Long

Scope of work

The archive records improvements to the Nin Jiom Medicine Manufactory premises in Wang Chau, Yuen Long.

The Wang Lee Street frontage

The bilingual sign identifies the factory as Nin Jiom Medicine Manufactory (Hong Kong) Limited. It sits above a run of glazed doors and windows, with further windows at the level above. The Intellectual Property Department’s journal also identifies 50 Wang Lee Street in Yuen Long Industrial Estate as the company’s address. The construction entry dates the work to 2013–2014. The signage provides a direct connection between that written entry and the photographed industrial premises.

The covered edge of the factory

A second photograph looks across a paved area beside the factory. Metal posts run along its outer edge, supporting a continuous roof on framing that extends out from the building. The open side, underside of the canopy and doorways in the factory wall appear together in a single view. This part of the archive records the covered space between the enclosed premises and the open yard.

Dates in the project records

The profile identifies the site as 50 Wang Lee Street, Wang Chau, Yuen Long. The joint website lists factory improvement works in 2013–2014. Pages 130–131 of Milton’s profile separately record improvements, additions and alterations at the factory in 2016–2017.

Project source Milton / Ryer joint archive View project record

The factory canopy pictured in the archived engineering record
The factory canopy pictured in the archived engineering record

Photographs & drawings

Entrance sign at Nin Jiom Manufactory
The Chinese and English factory names appear above the entrance.
Factory canopy and adjoining loading yard
The yard opens out beyond one edge of the canopy.
Front view of the factory canopy
The front elevation shows the full canopy span against the factory.
All projects

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team