Building construction and foundations
From urban piling packages to the structure, finishes and services of a complete building.
Scope of service
Some appointments end at foundation level. Others run through to handover of an entire building. The first discussion establishes that boundary, the design information available, neighbouring uses and the order in which trades can enter the site.
A foundation package and a complete building
The 2014–2015 entry for 245–247 Tai Kok Tsui Road covers piling and foundations. The 2016–2017 entry for 16–18 Shanghai Street in Jordan covers a complete single-block building. An initial brief for either type should name the stage at which the works will be handed over.
Milton company profile, September 2025, pp. 2, 49, 79–80 and 87–88.
Two settings for new construction
The Shanghai Street building occupies a frontage between existing properties in Jordan. The street view puts deliveries and pedestrian access into perspective. At TVB City, the workshop extension instead shared a site with working studios. For an initial brief, mark the entrances, neighbouring uses and routes that must remain open on a site plan. It gives the project team a concrete starting point for discussing construction sequences.