Tai Kok Tsui, Kowloon
Foundations at 245–247 Tai Kok Tsui Road
Piling and foundation works on an urban site on Tai Kok Tsui Road.
Scope of work
Hoardings along the street mark the frontage of the site, with shops and residential buildings visible around it. The case sheet dates piling and foundation works to 2014–2015. The summary register also lists an August 2014 entry for piling and foundation design and names the architectural practice separately. The surviving street photographs document the work area in its neighbourhood setting.
Project source Milton Construction Engineering Limited, 2025 company profile, pp. 78, 87–88


