MILTON萬昇建築工程
Construction and alterations

Additions and alterations

Extend or reconfigure occupied premises and coordinate existing structure, services and access.

Inside a cutaway brick shell, green steel posts support a mezzanine on one side, with a stair linking the two levels.
A steel mezzanine and stair occupy one side of the brick shell, leaving a double-height bay alongside.

Scope of service

Start with the existing building. Reading its plans alongside the proposed use helps establish which rooms, routes and services will stay and where the consultants need to review a change. Even an alteration on a single floor can affect neighbouring occupiers.

Programming around occupied premises

The records describe a 2016 internal extension at the CUHK University Library and 2017–2018 alterations at SuperTerminal 1. A useful brief identifies busy hours, entrances that must stay open and dates when working areas can be handed over.

Milton company profile, September 2025, pp. 49, 83, 103–104 and 107–108.

Begin with a plan of what is there

Mark what stays, what is to be removed and what is proposed on the same existing floor plan. Add the floor level, principal routes, equipment positions and the viewpoints of supporting photographs. With this information an owner can explain exactly where a change begins and ends. An alteration within a cargo terminal and an extension beside a workshop both take place on occupied premises, but the access, working area and handover arrangements will differ.

White steel canopy at the Nin Jiom factory in Yuen Long
Nin Jiom Manufactory

Service illustrations and project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team