Turning an alteration idea into a workable brief

Connecting units, changing a staircase or bringing new plant into a building all depend on what is already there. A clear brief helps an adviser establish the appropriate route.

Entrance steps and handrail at So Hong Commercial Building
Sheung Wan · Entrance to So Hong Commercial Building

Start with the activities the space must support

Ask the people who use the space to mark out an ordinary working day on a floor plan. What moves between the two floors? Where do visitors queue? When is the lift busiest? Photograph corridors, plant-room doors, delivery entrances and walls adjoining neighbours. Mark which needs are essential and which could be met another way. When the team finds a constraint on the structure or access, the owner can see which options remain open.

Put approved drawings beside the present layout

A letting plan may omit beams, escape routes and earlier alterations. Gather available approved plans, records of previous works, the deed of mutual covenant and management rules. Keep the dates on older drawings. Buildings Department guidance directs owners to seek building professional advice on additions and alterations. Certain designated minor works can follow simplified requirements. Ask the appointed professional to identify the route that applies to this particular proposal.

Define the floors and connections affected

The joint archive records alterations to two floors at 32 D’Aguilar Street in Central and separate works at SuperTerminal 1 in Chek Lap Kok. The same project category covers quite different settings. For a new enquiry, name the floors and shared service shafts, any rooms that may be out of use and the arrangements for deliveries. A building manager can then check actual access and explain the likely impact to neighbours.

Illustration of engineers reviewing drawings
A drawing review illustrates a team checking design information before work.