MILTON萬昇建築工程

Ma Liu Shui, Sha Tin

Internal extension at CUHK Library

A 2016 internal extension at the Chinese University of Hong Kong Library.

Glazed library elevation
A multistorey glazed elevation at the CUHK University Library.

Scope of work

Views of the glazed entrance, building elevations and surrounding paths place the library within the university campus. Milton’s profile identifies an internal extension at the library. The improvements to Chung Chi Tang in the same year have a separate entry, with their own location and photographs.

Project source Milton Construction Engineering Limited, 2025 company profile, pp. 107–108

Long white library wing
The long white library wing with rows of narrow windows.
CUHK University Library entrance
Entrance steps beside the University Library lettering.
Library interior behind glass
Interior levels and lights seen through the library glazing.
Campus forecourt outside the library
An elevated view of the campus forecourt, steps and curved paths outside the library.

Photographs & drawings

Glazed library corner adjoining a pale wing
The glazed library volume meets the white-finned wing along the road at CUHK · Company profile, p. 108
Library frontage at dusk
The stepped massing and vertical window bands of CUHK Library are seen from the forecourt at dusk · Company profile, p. 108
All projects

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team