MILTON萬昇建築工程

7 images

CUHK University Library extension

Pages 107–108 document an internal extension at the University Library. Exterior and entrance views identify the project setting.

Project record · Internal extension at CUHK Library
Glazed library elevation
A multistorey glazed elevation at the CUHK University Library · Company profile, p. 107
Long white library wing
The long white library wing with rows of narrow windows · Company profile, p. 108
CUHK University Library entrance
Entrance steps beside the University Library lettering · Company profile, p. 108
Library interior behind glass
Interior levels and lights seen through the library glazing · Company profile, p. 108
Campus forecourt outside the library
An elevated view of the campus forecourt, steps and curved paths outside the library · Company profile, p. 108
Glazed library corner adjoining a pale wing
The glazed library volume meets the white-finned wing along the road at CUHK · Company profile, p. 108
Library frontage at dusk
The stepped massing and vertical window bands of CUHK Library are seen from the forecourt at dusk · Company profile, p. 108
Back to the project gallery

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team