What should a façade tender say about scaffold toe-boards, screens and catch-fans?

On 31 July, addenda to the safety codes for both bamboo and metal scaffolds took immediate effect. Owners planning façade repairs can ask bidders to identify materials, supporting evidence and responsibility for three parts of the scaffold before comparing prices.

Field note published

Bamboo poles and lashings in front of window openings on Shanghai Street
Bamboo scaffolding crosses the façade in front of window openings at 16–18 Shanghai Street, Jordan. Milton and Ryer joint project archive.

What the toe-board specification needs to address

The Labour Department gazetted the two addenda on 31 July 2026. Both took effect that day.

The addenda set material requirements for toe-boards. They need sufficient strength to help prevent people or objects from falling from the scaffold, and the material should not increase the fire risk. At tender stage, the owners’ consultant can request a separate description of the proposed material and how replacements will be managed, giving bidders a common basis for pricing.

Screens and catch-fans have different references

Protective screens include nets, tarpaulins, plastic sheeting and canvas. The addenda refer to Buildings Department Practice Note for Registered Contractors 85 for their fire-retardant performance. For catch-fans, the design and installation must meet the relevant provisions of the department’s Guidelines on the Design and Construction of Bamboo Scaffolds. Both references also feature in the metal scaffolding code update.

Keep replacement materials traceable

If a street-facing screen is damaged during the works, ask the contractor to identify the replacement material and delivery batch, and to link the supporting document to that batch. The project team can then verify it under the applicable procedure. Write this arrangement into the contract and name who will review the catch-fan design and receive inspection records. The next contractor or shift can trace a change made on site.