3 Salisbury Road, Tsim Sha Tsui
Rooftop sign and LED refurbishment at Star House
The rooftop sign and LED installation at Star House, 3 Salisbury Road, Tsim Sha Tsui, were refurbished in 2018.
Scope of work
The façade and red rooftop lettering identify Star House from the street. A second view, taken at roof level, shows the steelwork beside the letters and gives the sign a structural context.
Project source Milton Construction Engineering Limited, 2025 company profile, pp. 76, 137. View project record


