MILTON萬昇建築工程

12 images

Kong Ling Building

Building refurbishment.

Project record · Kong Ling Building refurbishment on Jervois Street
Kong Ling Building entrance
Finished entrance steps and handrail at Kong Ling Building on Jervois Street · Company profile, p. 209View register entry
Scaffold netting beside an adjoining glazed elevation
Kong Ling Building. Scaffold netting beside an adjoining glazed elevation · Company profile, p. 209
Scaffold tubes and fittings close to the façade
Kong Ling Building. Scaffold tubes and fittings close to the façade · Company profile, p. 209
Corner of the building under scaffold netting
Kong Ling Building. Corner of the building under scaffold netting · Company profile, p. 209
Common stair with light-coloured wall finishes
Kong Ling Building. Common stair with light-coloured wall finishes · Company profile, p. 209
Netted building frontage viewed from the street
Kong Ling Building. Netted building frontage viewed from the street · Company profile, p. 209
Recessed ceiling lighting along the common passage
Kong Ling Building. Recessed ceiling lighting along the common passage · Company profile, p. 209
Shared interior passage between levels
Kong Ling Building. Shared interior passage between levels · Company profile, p. 209
Floor surface being repaired along the foot of the wall
Kong Ling Building. Floor surface being repaired along the foot of the wall · Company profile, p. 209
Tools and materials at a floor repair
Kong Ling Building. Tools and materials at a floor repair · Company profile, p. 209
Work area where the wall meets the floor
Kong Ling Building. Work area where the wall meets the floor · Company profile, p. 209
Chinese and English building name on the canopy
Kong Ling Building. Chinese and English building name on the canopy · Company profile, p. 209
Back to the project gallery

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team