MILTON萬昇建築工程

100 Jervois Street, Sheung Wan

Kong Ling Building refurbishment on Jervois Street

Kong Ling Building at 100 Jervois Street, Sheung Wan, underwent refurbishment in 2024–2025.

Kong Ling Building entrance
Finished entrance steps and handrail at Kong Ling Building on Jervois Street.

Scope of work

The photographs follow the work from the netted façade and entrance canopy to the common stair, passage lighting and repairs where the floor meets the wall. The bilingual building name identifies the entrance.

Project source Milton Construction Engineering Limited, 2025 company profile, pp. 77, 209. View project record

Scaffold netting beside an adjoining glazed elevation
Kong Ling Building. Scaffold netting beside an adjoining glazed elevation · Company profile, p. 209
Scaffold tubes and fittings close to the façade
Kong Ling Building. Scaffold tubes and fittings close to the façade · Company profile, p. 209
Corner of the building under scaffold netting
Kong Ling Building. Corner of the building under scaffold netting · Company profile, p. 209
Common stair with light-coloured wall finishes
Kong Ling Building. Common stair with light-coloured wall finishes · Company profile, p. 209
Netted building frontage viewed from the street
Kong Ling Building. Netted building frontage viewed from the street · Company profile, p. 209
Recessed ceiling lighting along the common passage
Kong Ling Building. Recessed ceiling lighting along the common passage · Company profile, p. 209
Shared interior passage between levels
Kong Ling Building. Shared interior passage between levels · Company profile, p. 209
Floor surface being repaired along the foot of the wall
Kong Ling Building. Floor surface being repaired along the foot of the wall · Company profile, p. 209
Tools and materials at a floor repair
Kong Ling Building. Tools and materials at a floor repair · Company profile, p. 209
Work area where the wall meets the floor
Kong Ling Building. Work area where the wall meets the floor · Company profile, p. 209
Chinese and English building name on the canopy
Kong Ling Building. Chinese and English building name on the canopy · Company profile, p. 209

Photographs & drawings

All projects

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team