MILTON萬昇建築工程

15 Queen’s Road Central

Alterations and interior fit-out at Edinburgh Tower

The 2017 works at Edinburgh Tower, 15 Queen’s Road Central, covered additions, alterations and interior fit-out.

Dark wall panels at Edinburgh Tower
Dark panelled walls in a room in the Edinburgh Tower fit-out record.

Scope of work

The photographs follow a passage with dark doorframes into the adjoining rooms. Dark wall panels and timber finishes open onto a brightly lit basin area, showing the materials and arrangement of this interior.

Project source Milton Construction Engineering Limited, 2025 company profile, pp. 126–127. View project record

Passage with dark doorframes leading to an interior room
A passage on the Edinburgh Tower project plate looks through dark doorframes towards an inner room · Company profile, p. 126
Grid-patterned commercial tower seen from street level
The Edinburgh Tower project page uses this Central street view to set the building beside an adjacent glazed façade · Company profile, p. 126
Dark-panelled room beside a brightly lit basin area
Dark interior panelling meets a brightly lit basin area in the adjoining space at Edinburgh Tower · Company profile, p. 127

Photographs & drawings

All projects

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team