Tsing Yi, New Territories

Refurbishment of the cement works in Tsing Yi

Refurbishment of the cement works in Tsing Yi began in 2024 and was listed as under way in the 2025 profile.

Concrete inspection at the Tsing Yi cement plant
A worker examining a concrete element during the Tsing Yi cement plant works.

Scope of work

The site photographs record concrete inspection, tools in the work area and linear exposed patches along marked surfaces. Another view looks down from the scaffold during external works.

Recorded as in progress in the 2025 company profile.

Project source Milton Construction Engineering Limited, 2025 company profile, pp. 77, 194. View project record

Mixing container and tools in the work area
Cement works in Tsing Yi. Mixing container and tools in the work area · Company profile, p. 194
Looking down from a scaffold during external works
Cement works in Tsing Yi. Looking down from a scaffold during external works · Company profile, p. 194
Linear exposed patch on a marked concrete surface
Cement works in Tsing Yi. Linear exposed patch on a marked concrete surface · Company profile, p. 194
Linear exposure along a marked repair area
Cement works in Tsing Yi. Linear exposure along a marked repair area · Company profile, p. 194
Local exposure along a concrete edge
Cement works in Tsing Yi. Local exposure along a concrete edge · Company profile, p. 194
Work marks on a level concrete surface
Cement works in Tsing Yi. Work marks on a level concrete surface · Company profile, p. 194
Bagged material stacked at the work site
Cement works in Tsing Yi. Bagged material stacked at the work site · Company profile, p. 194
Scaffold netting along the cement works’ cylindrical building
Cement works in Tsing Yi. Scaffold netting along the cement works’ cylindrical building · Company profile, p. 194
Reference grid marked on a concrete surface
Cement works in Tsing Yi. Reference grid marked on a concrete surface · Company profile, p. 194
Inspection area marked on the wall
Cement works in Tsing Yi. Inspection area marked on the wall · Company profile, p. 194
Marked joint in a concrete surface
Cement works in Tsing Yi. Marked joint in a concrete surface · Company profile, p. 194