MILTON萬昇建築工程

12 images

Cement works in Tsing Yi

Plant refurbishment, recorded as in progress in the September 2025 profile.

Project record · Refurbishment of the cement works in Tsing Yi
Concrete inspection at the Tsing Yi cement plant
A worker examining a concrete element during the Tsing Yi cement plant works · Company profile, p. 194View register entry
Mixing container and tools in the work area
Cement works in Tsing Yi. Mixing container and tools in the work area · Company profile, p. 194
Looking down from a scaffold during external works
Cement works in Tsing Yi. Looking down from a scaffold during external works · Company profile, p. 194
Linear exposed patch on a marked concrete surface
Cement works in Tsing Yi. Linear exposed patch on a marked concrete surface · Company profile, p. 194
Linear exposure along a marked repair area
Cement works in Tsing Yi. Linear exposure along a marked repair area · Company profile, p. 194
Local exposure along a concrete edge
Cement works in Tsing Yi. Local exposure along a concrete edge · Company profile, p. 194
Work marks on a level concrete surface
Cement works in Tsing Yi. Work marks on a level concrete surface · Company profile, p. 194
Bagged material stacked at the work site
Cement works in Tsing Yi. Bagged material stacked at the work site · Company profile, p. 194
Scaffold netting along the cement works’ cylindrical building
Cement works in Tsing Yi. Scaffold netting along the cement works’ cylindrical building · Company profile, p. 194
Reference grid marked on a concrete surface
Cement works in Tsing Yi. Reference grid marked on a concrete surface · Company profile, p. 194
Inspection area marked on the wall
Cement works in Tsing Yi. Inspection area marked on the wall · Company profile, p. 194
Marked joint in a concrete surface
Cement works in Tsing Yi. Marked joint in a concrete surface · Company profile, p. 194
Back to the project gallery

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team