Entries for 41–47 Jervois Street in Sheung Wan cover lobby refurbishment, podium waterproofing and canopy strengthening.

Entrance steps at So Hong Commercial Building
Broad entrance steps, a central handrail and lighting at So Hong Commercial Building.

Scope of work

A street entrance on Jervois Street opens into a narrow lobby. The English name of the building appears on its internal signage. The profile features the property twice. Reading the scopes alongside their dates identifies which entry covers the podium and which covers the canopy.

Scopes recorded in 2021 and 2024–2025

The 2021 sheet specifies the ground-floor lobby and podium waterproofing. The 2024–2025 entry pairs lobby refurbishment with canopy strengthening. An earlier summary table identifies a separate roof waterproofing design-and-build scope at the same address.

Project source Milton Construction Engineering Limited, 2025 company profile, pp. 72, 84, 210

Recorded phases of work

Roof waterproofing design and construction
Year unrecorded · Profile p. 72
Ground-floor lobby refurbishment and podium waterproofing
2021 · Profile p. 84
Lobby refurbishment and canopy strengthening
2024–2025 · Profile p. 210
So Hong Commercial Building street elevation
Street elevation and ground-floor entry from Jervois Street.
Lobby wall finishes and display
A lobby display set beside pale stone-patterned panels and the building name.

Photographs & drawings

Passage inside the So Hong Commercial Building lobby
Pale wall panels and a stone floor lead into the inner lobby passage · Company profile, p. 84
Timber handrail on pale wall panels
The timber handrail follows the rise of the entrance steps at So Hong Commercial Building · Company profile, p. 84
Close view of stone steps and a handrail
Viewed from below, alternating bands of stone on the entrance steps lead up to the lobby · Company profile, p. 84