MILTON萬昇建築工程

8 images

So Hong Commercial Building

Pages 84 and 210 record successive works to the lobby, podium and canopy at So Hong Commercial Building in Sheung Wan.

Project record · So Hong Commercial Building
Entrance steps at So Hong Commercial Building
Broad entrance steps, a central handrail and lighting at So Hong Commercial Building · Company profile, p. 84
So Hong Commercial Building street elevation
Street elevation and ground-floor entry from Jervois Street · Company profile, p. 84
Lobby wall finishes and display
A lobby display set beside pale stone-patterned panels and the building name · Company profile, p. 210
Passage inside the So Hong Commercial Building lobby
Pale wall panels and a stone floor lead into the inner lobby passage · Company profile, p. 84
Timber handrail on pale wall panels
The timber handrail follows the rise of the entrance steps at So Hong Commercial Building · Company profile, p. 84
Close view of stone steps and a handrail
Viewed from below, alternating bands of stone on the entrance steps lead up to the lobby · Company profile, p. 84
Metal cabinet at the lobby wall
A metal cabinet meets the lobby wall beside the pavement-facing entrance · Company profile, p. 84
View from the stone-floored lobby to the street
The stone floor and entrance frame open towards the shopfronts across the street · Company profile, p. 84
Back to the project gallery

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team