Works and safety management at Mei Lam Estate

The 2009 Mei Lam Estate assignment covered works supervision. The index also records project and safety management.

Elevated view of housing blocks in the valley
An elevated view on the Mei Lam Estate project plate sets the housing blocks against the surrounding hills · Company profile, p. 97

Scope of work

The site was on Mei Tin Road in Tai Wai. An elevated view sets the estate against the hills, while the ground-level sequence shows podium shops, covered passages and the space between the residential blocks.

A further photograph records an inspection visit on the estate platform.

Project source Milton Construction Engineering Limited, 2025 company profile, pp. 72, 97–98. View project record

Outdoor work area at Mei Lam Estate
Outdoor work area and surrounding residential towers at Mei Lam Estate.
Site visitors beside the estate platform railing
The profile records an estate visit, with participants looking out from a raised platform · Company profile, p. 97
Low estate building across an open forecourt
A low building faces an open paved forecourt in this Mei Lam Estate context photograph · Company profile, p. 98
Podium building and ground-level shops at Mei Lam Estate
The podium, ground-level shops and residential towers are seen together from the estate plaza · Company profile, p. 98
Sunlit residential elevation at Mei Lam Estate
The regular window grid of a Mei Lam Estate block rises from shade into sunlight · Company profile, p. 98
Covered walkway beneath a residential block
A long covered walkway runs beneath one of the residential blocks at Mei Lam Estate · Company profile, p. 98