MILTON萬昇建築工程

Ping Chong Road, Cheung Chau

Major refurbishment at 6 Ping Chong Road, Cheung Chau

Major refurbishment at 6 Ping Chong Road, Cheung Chau, began in 2024 and was listed as under way in the 2025 profile.

Slab reinforcement on Ping Chong Road
Slab reinforcement and temporary edge protection at the Ping Chong Road site on Cheung Chau.

Scope of work

The record includes slab reinforcement, unfinished floors, concrete stairs and floor openings. A view of the red-and-grey elevation and blue canopy places these construction details in the context of the building.

Recorded as in progress in the 2025 company profile.

Project source Milton Construction Engineering Limited, 2025 company profile, pp. 77, 208. View project record

Building corner during works on Cheung Chau
Corner elevation and open ground floor of the building under refurbishment on Ping Chong Road.
Construction materials stacked on the floor
6 Ping Chong Road. Construction materials stacked on the floor · Company profile, p. 208
Red-and-grey elevation with a blue canopy
6 Ping Chong Road. Red-and-grey elevation with a blue canopy · Company profile, p. 208
Materials stored in a sheltered part of the ground floor
6 Ping Chong Road. Materials stored in a sheltered part of the ground floor · Company profile, p. 208
Side elevation with small windows and temporary fencing
6 Ping Chong Road. Side elevation with small windows and temporary fencing · Company profile, p. 208
Work materials at ground level beside green netting
6 Ping Chong Road. Work materials at ground level beside green netting · Company profile, p. 208
Concrete stairs and floor openings during works
6 Ping Chong Road. Concrete stairs and floor openings during works · Company profile, p. 208
Lower floor with exposed structure and unfinished surfaces
6 Ping Chong Road. Lower floor with exposed structure and unfinished surfaces · Company profile, p. 208

Photographs & drawings

All projects

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team