MILTON萬昇建築工程

Beach Road, Repulse Bay

Slope refurbishment on Beach Road

Slope refurbishment on Beach Road, Repulse Bay, began in 2024 and was listed as under way in the 2025 profile.

Slope face on Beach Road
Slope face and vegetation at the Beach Road works in Repulse Bay.

Scope of work

Views from above and from ground level record the angle and height of the slope. Parallel lines across the concrete face and a play area beside its base place the work in its setting.

Recorded as in progress in the 2025 company profile.

Project source Milton Construction Engineering Limited, 2025 company profile, pp. 77, 191. View project record

Angled retaining slope viewed from above
Beach Road slope. Angled retaining slope viewed from above · Company profile, p. 191
Parallel lines across the concrete slope surface
Beach Road slope. Parallel lines across the concrete slope surface · Company profile, p. 191
Street-facing building pictured on the slope project sheet
Beach Road slope. Street-facing building pictured on the slope project sheet · Company profile, p. 191
High concrete slope beside a play area
Beach Road slope. High concrete slope beside a play area · Company profile, p. 191