MILTON萬昇建築工程

10 images

165–167 Wong Nai Chung Road

Building refurbishment.

Project record · Refurbishment at 165–167 Wong Nai Chung Road
Concrete parapet on Wong Nai Chung Road
Concrete parapet, scaffolding and temporary cables during the Wong Nai Chung Road works · Company profile, p. 192View register entry
Local patches across a concrete soffit
165–167 Wong Nai Chung Road. Local patches across a concrete soffit · Company profile, p. 192
Beam soffit and stripped surface above a window
165–167 Wong Nai Chung Road. Beam soffit and stripped surface above a window · Company profile, p. 192
Patches of varying tone on a wall surface
165–167 Wong Nai Chung Road. Patches of varying tone on a wall surface · Company profile, p. 192
Junction between new and existing masonry at a terrace
165–167 Wong Nai Chung Road. Junction between new and existing masonry at a terrace · Company profile, p. 192
Looking up at scaffold lifts around the corner of the building
165–167 Wong Nai Chung Road. Looking up at scaffold lifts around the corner of the building · Company profile, p. 192
Narrow terrace and parapet beside the scaffolding
165–167 Wong Nai Chung Road. Narrow terrace and parapet beside the scaffolding · Company profile, p. 192
Concrete parapet at the corner of the terrace
165–167 Wong Nai Chung Road. Concrete parapet at the corner of the terrace · Company profile, p. 192
Protective sheeting across the street-facing elevation
165–167 Wong Nai Chung Road. Protective sheeting across the street-facing elevation · Company profile, p. 192
Stacked windows along the street elevation
165–167 Wong Nai Chung Road. Stacked windows along the street elevation · Company profile, p. 192
Back to the project gallery

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team