Castle Peak Road, New Territories

Villa construction at 432 Castle Peak Road

The villa project at 432 Castle Peak Road began in 2020 and was recorded as under way in the 2025 profile.

Crawler crane at the villa site
A crawler crane beside the trees and the hillside.

Scope of work

The hillside photographs show a crawler crane, stacked steel sections and protective slope netting. Formwork marks in a concrete wall and a working platform record the structure during construction.

Recorded as in progress in the 2025 company profile.

Project source Milton Construction Engineering Limited, 2025 company profile, pp. 166–167. View project record

Hillside site on Castle Peak Road
A working platform at the foot of the hillside construction site.
Formwork marks on a concrete wall
Formwork joints and tie holes on the face of a cast concrete wall.
Crane and stacked steel sections
Steel sections stacked on the working platform around the crane.
Protective mesh on the slope face
Protective mesh laid across the face of the slope.
Lifting equipment and steel on the Castle Peak Road site
A lifting hook hangs over stored steel and plant on the working platform · Company profile, p. 167
Green netting over the rock face
An oblique view along the base shows netting following the irregular rock face and patches of vegetation · Company profile, p. 167
Metal scaffold and boards along the rock face
A work platform and its horizontal supports follow the rock face · Company profile, p. 167
Front detail of platform supports against the rock
A closer frontal view records the platform supports against the uneven stone · Company profile, p. 167
Oblique view along the rock-face platform
From one end, the boarded platform extends along the face above the slope toe · Company profile, p. 167