MILTON萬昇建築工程

10 images

Castle Peak Road villa construction

Pages 166–167 show the hillside, construction equipment and cast concrete at the villa site at 432 Castle Peak Road.

Project record · Villa construction at 432 Castle Peak Road
Hillside site on Castle Peak Road
A working platform at the foot of the hillside construction site · Company profile, p. 166View register entry
Crawler crane at the villa site
A crawler crane beside the trees and the hillside · Company profile, p. 166
Formwork marks on a concrete wall
Formwork joints and tie holes on the face of a cast concrete wall · Company profile, p. 167
Crane and stacked steel sections
Steel sections stacked on the working platform around the crane · Company profile, p. 167
Protective mesh on the slope face
Protective mesh laid across the face of the slope · Company profile, p. 167
Lifting equipment and steel on the Castle Peak Road site
A lifting hook hangs over stored steel and plant on the working platform · Company profile, p. 167
Green netting over the rock face
An oblique view along the base shows netting following the irregular rock face and patches of vegetation · Company profile, p. 167
Metal scaffold and boards along the rock face
A work platform and its horizontal supports follow the rock face · Company profile, p. 167
Front detail of platform supports against the rock
A closer frontal view records the platform supports against the uneven stone · Company profile, p. 167
Oblique view along the rock-face platform
From one end, the boarded platform extends along the face above the slope toe · Company profile, p. 167
Back to the project gallery

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team