MILTON萬昇建築工程

Canton Road, Mong Kok

Refurbishment at 1058 Canton Road

The refurbishment of 1058 Canton Road in Mong Kok is recorded for 2024–2025.

Scaffold mesh and adjoining rows of windows
1058 Canton Road. Scaffold mesh and adjoining rows of windows · Company profile, p. 193

Scope of work

The sequence begins with scaffold mesh and window rows, then moves closer to marks on a concrete surface, a local repair at the wall edge and a levelled patch after treatment.

Project source Milton Construction Engineering Limited, 2025 company profile, pp. 77, 193. View project record

Wall repair on Canton Road
A rectangular wall repair at 1058 Canton Road in Mong Kok.
Repair area marked on a concrete surface
1058 Canton Road. Repair area marked on a concrete surface · Company profile, p. 193
Local repair at the edge of a wall
1058 Canton Road. Local repair at the edge of a wall · Company profile, p. 193
A levelled patch on the wall after treatment
1058 Canton Road. A levelled patch on the wall after treatment · Company profile, p. 193
Concrete surface around the corner of a building element
1058 Canton Road. Concrete surface around the corner of a building element · Company profile, p. 193
Concrete corner beside scaffold poles
1058 Canton Road. Concrete corner beside scaffold poles · Company profile, p. 193
Circular inspection mark on a beam soffit
1058 Canton Road. Circular inspection mark on a beam soffit · Company profile, p. 193

Photographs & drawings

All projects

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team